Public CCS / corridors

Public charging access

Public commercial charging for medium- and heavy-duty electric trucks — corridor sites you can plan a live load around, without a private MCS host agreement.

Greenlane

Greenlane

A nationwide public fast-charging network for commercial ZEVs, built as a joint venture of Daimler Truck North America, BlackRock Climate Infrastructure, and NextEra Energy. Pull-through and bobtail lanes, session reservations, and a fleet software layer so charging is planned with the load — not after it.

  • Flagship public site in Colton, California (I-10 / I-215), opened 2025 — on the order of 40+ publicly accessible chargers, ~400 kW pull-through and ~180–240 kW bobtail lanes, with driver amenities.
  • Built as a corridor network (I-15 Los Angeles–Las Vegas and I-10 toward Phoenix), not one-off lots.
  • Colton is CCS-class high-power today, future-proofed for MCS as trucks and utility upgrades land. It is not a yellow Private MCS pin.